0
Rooms
0
New UK hotels
0
New Dublin hotel
0
Extensions to existing hotels
Q2 2024

Maldron Hotel Cathedral Quarter Manchester

maldron hotel victoria manchester thumb
This new 4-star Maldron hotel will be will be ideally located close to Victoria train station, the Manchester Arena, the Spinningfields Commercial district and the retail core of the city. The hotel will have over 180 bedrooms, a bar, restaurant and coffee dock. Dalata will operate the hotel on a 35-year Operating Lease. Planning permission has been approved for this development with the hotel expected to open in Q2 2024.
Q2 2024

Maldron Hotel Liverpool City

6. sustainable growth maldron liverpool scaled e1693268931522
This new 4-star Maldron hotel will be adjacent to the award winning Liverpool One retail and leisure complex and within walking distance of all the city centre attractions. The hotel will be of part of a mixed-use scheme being jointly developed by the Elliot Group and Valorem. The hotel will comprise approximately 260 rooms, a restaurant, a bar and meeting room facilities. Dalata will operate the hotel on a 35-year Operating Lease. Planning permission has been approved for this development with the hotel expected to open in Q2 2024.
Q3 2024

Maldron Hotel Shoreditch, London

Maldron Shoreditch 2
This new Maldron hotel will be a 4-star property located in the heart of Shoreditch, immediately to the north of the City of London. Shoreditch has become a popular and fashionable part of London. The hotel is superbly located 500 metres from Old Street Underground Station and 800 metres from Liverpool Street Underground Station. Dalata acquired the fantastic site on Paul Street for £32.05 million with planning approval for a new hotel. The new Maldron hotel will have 157 rooms, restaurant and bar facilities. Construction of the hotel commenced in August 2021 with the hotel projected to open in Q3 2024.
Q3 2024

Maldron Hotel Brighton

Maldron Hotel Brighton
This new 221-bedroom new hotel will be close to the waterfront in the city of Brighton. The Brighton Conference Centre, Brighton pier and the mainline train station are all located within walking distance. The 4-star property will include a bar, restaurant, gym and six meeting rooms. Dalata will operate the hotel on a 35-year Operating Lease. Construction of the hotel commenced at the start of 2022 with the hotel expected to open in Q3 2024.
H1 2026

Maldron Hotel Croke Park, Dublin

maldron hotel croke park
This new Maldron hotel will be a 4-star property located adjacent to Croke Park Stadium in central Dublin. The hotel, which will be located on the junction of Clonliffe Road and Jones's Road will also enjoy excellent connectivity to the air, road and rail network, with Drumcondra Train station and Aircoach stop a 7-minute walk from the hotel. The hotel will also benefit from its proximity to Dublin's city centre, the IFSC and exciting new developments such as the Technological University campus at Grangegorman. The hotel will have approximately 200 bedrooms, a business centre with 6 meeting rooms, together with bar and restaurant facilities. Dalata will operate the hotel on a 35-year Operating Lease. Planning permission has been approved for this development with the hotel expected to open in H1 2026.
H2 2026

Site at St. Andrew's Square, Edinburgh

The development site, which is superbly located fronting on to St. Andrew’s Square, one of the most prestigious areas in Edinburgh and within close proximity to the city’s key corporate and leisure demand drivers, was acquired in September 2023 for a total consideration of £12.5 million.

Subject to a successful revised planning application, the Clayton hotel will incorporate 167 bedrooms, a bar, restaurant, dry gym and two large meeting rooms with stunning period features on the first floor overlooking St. Andrew’s Square.

The overall investment in the project, including the site purchase, will be c. £50 million and is expected to complete by H2 2026.
H1 2027

Extension at Clayton Hotel Manchester Airport

Clayton Manchester Airport Exterior  scaled
Dalata are adding an extension to its existing hotel at Clayton Hotel Manchester Airport. Subject to planning, the project will comprise a 9-storey 216 bedroom extension to the existing 365 bedroom hotel. The estimated investment of £40 million also provides for a refurbishment of the ground floor and a portion of bedrooms. The extension is targeted to complete in H1 2027.
Date TBC

Extension at Clayton Hotel Cardiff Lane, Dublin

Cardiff Lane Exterior Hotel scaled
Dalata are adding an extension to its existing hotel at Clayton Hotel Cardiff Lane. This 4 star property is located in Dublin’s docklands, in the heart of the city. The area has a strong presence of multinational technology firms and is within close proximity to Dublin city centre shopping and the iconic Dublin attractions. The additional 117 new bedrooms will complement the new Meeting and Events centre which was completed in November 2020. The extension is at the pre-construction phase with planning permission secured. The opening date for this project is currently under review.